Warning: mkdir(): No space left on device in /www/wwwroot/NEW17.COM/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/sh-yikai.com/cache/39/34551/bb260.html): failed to open stream: No such file or directory in /www/wwwroot/NEW17.COM/func.php on line 115
HENGTONG GROUP CO.,LTD.
  • 丝瓜成人APP视频,丝瓜视频成人,丝瓜视频成年人,丝瓜视频污片下载

    News

    News

    Home| News| News

    Hengtong have successfully completed the installation of the latest-model large capacity WTGs of Bozhong-A 501MW Offshore Wind Farm

    2022-9-15 5593 Font size:

    Hengtong has installed the first wind turbine of the Bozhong Off-shore Wind Farm’s Site A project, setting a new milestone after last year’s record of installing 12 deep sea wind turbines within one month. It is estimated that the Site A project, which scales 60 sets of H220-8350 wind power generators with a capacity of 501 MW, will provide 1.698 billion kWh green power every year, saving some 519,800 tons of coal equivalent and cutting 1,257,700 or so tons of CO2 emissions.


    Utilizing our strong installation competence, qualified solution and professional crew, Hengtong provides comprehensive services for offshore wind power globally; and higher capabilities are soon expected to be added.


    Hengtong never stops greening the world with its expertise.

     

    1663202330933.jpg

    网站地图